Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

February 19, 2024

July 12, 2024

Multiple Locations

New Construction, Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Marietta, GA

Subscribe to View Full Documents

East Cobb Group 1. Pitner Elementary School, 4575 Wade Green Road, Acworth, GA 30102 2. Davis Elementary School, 2433 Jamerson Road, Marietta, GA 30066 3. Mabry Middle School, 2700 Jims Road, Marietta, GA 30066 4. Shallowford Falls Elementary School, 3529 Lassiter Road, Marietta, GA 30062 Davis ES Bus Parking and Car Drop-Off Canopy A. Bus Parking Area: Construction of a new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. B. Car Drop-off Area: Construction of a new prefabricated aluminum canopy cantilevered bent system consisting of a single column used to support a beam to which an extruded deck canopy roof is attached. Saw cutting and patching of the existing concrete walkway will be required to accommodate installation of underground downspouts for the cantilevered bent system. C. New LED lighting shall be included as part of the new canopy installation scope. D. Removal of existing trees and shrubbery located directly adjacent to the building on the bus parking side is included in the scope of the work and well a providing new sod to address erosion control. Mabry MS Front Entrance Canopy The construction of a stepped new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached at the front entrance to the school. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. New LED lighting shall be included as part of the new canopy installation scope. Pitner ES Car Drop-Off Canopy A. Hip Canopy Roof: Construction of a new prefabricated aluminum canopy with an extruded roof deck attached to prefabricated aluminum rafters and aluminum beams supported on 4 aluminum columns at the front entry area of the school. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. B. Car Drop-off Area: Construction of a new prefabricated aluminum canopy cantilevered bent system consisting of a single column used to support a beam to which an extruded deck canopy roof is attached. Saw cutting and patching of the existing concrete walkway will be required to accommodate installation of column foundations and underground downspouts for the cantilevered bent system. C. New LED lighting shall be included as part of the new canopy installation scope. Shallowford Falls ES Car Drop-Off Canopy The construction of a new prefabricated aluminum canopy U-Bent system consisting of 2 columns supporting a beam to which an extruded deck canopy roof is attached. This project also entails saw cutting and patching of the existing concrete walkway for the installation of the foundations for the new canopy columns. New LED lighting shall be included as part of the new canopy installation scope. Painting of the existing steel columns, beams and metal roof deck at the existing canopy at the building’s entry area shall be included as part of the project scope of work. Notice of Award: February 16, 2024 Contract Start: March 1, 2024 Substantial Completion: July 12, 2024 *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.