Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

May 24, 2024

July 25, 2024

Multiple Locations

Renovation

No Information to Display

$850,000.00

Public - City

img_map_placeholder

Multiple Locations, Fort Wayne, IN

Our team is requesting plans for this project.

Subscribe to View Full Documents

FWCS 2024 General Building Systems (GBS) Replacement of doors at Holland Elementary, Shambaugh Elementary, Bunche Montessori, Kekiongia Middle School, Maplewood Elementary Levan Scott Academy. Replacement of restroom ceilings and lights at Arlington Elementary and Lincoln Elementary. Replacement of cubbie and casework at Arlington Elementary, Holland Elementary, Lincoln Elementary, Northcrest Elementary, Shambaugh Elementary, Bunche Montessori, Kekiongia Middle, Maplewood Elementary, and Washington Elementary. Restroom renovation at Kekiongia Middle. Bids received after that time or in another location shall be returned to the bidder unopened. ONLY COMPLETE SETS OF PLANS AND SPECIFICATIONS WILL BE DISTRIBUTED. Unlocked electronic PDF sets of drawings will be available for an additional cost. Any unsuccessful bidder, upon returning such sets in good and usable condition within (10) ten days of the bid date will be refunded their deposit. There will be shipping and handling charges for the delivery of each set of Bidding Documents. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten ( 10 ) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects