Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2024

March 1, 2024

May 30, 2024

To Be Determined

Asbestos Abatement, LEED Certification, Site Work

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Frankfort, KY

6

5

Subscribe to View Full Documents

David and Rose Anderson Drainage AML Reclamation Project. Project Description The David and Rose Anderson Drainage AML Reclamation Project is located near Dorton in Pike County at 5955 Dorton-Jenkins Road, Jenkins KY 41537 . GPS coordinates are 37 12' 40.079" N, 82 33' 51.959" W. The citizen and a neighboring residence are being impacted by drainage from an eligible mine immediately upslope. To abate this problem, a combination ditch (12-inch dia. subdrain with 2-foot flat bottom class II ditch top treatment) will be installed on the slope behind the residences to collect mine drainage from the eligible seam. Subdrain will also be installed behind the Terry Mullins residence to collect existing standing water immediately behind the residence. All collected drainage will be routed through subsurface drains to the natural drain adjacent to the site and, ultimately, across the state highway (KY-805) to Elkhorn Creek using existing drains. The disturbance at the project site is expected to encompass approximately 1 acre. Cover crop is also included to provide quick vegetative cover on any disturbed areas that will go undisturbed for at least two weeks, but not be ready for application of permanent revegetation. This project does not disturb natural streams, and sediment control will be provided using silt bales and fence. All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing office Question Deadline 01/21/2024

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.