Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2024

June 24, 2024

August 2, 2024

220 W Kennedy St

Renovation

No Information to Display

$120,000.00

Public - County

img_map_placeholder

220 W Kennedy St, Syracuse, NY

6

6

3

Subscribe to View Full Documents

Reference Number 0000338696 Question Acceptance Deadline 01/18/2024 04:00 PM EST Questions are submitted online No, Contact Person: Please direct any questions in writing to Brian Chairmonte, Specification Writer, Division of Purchase at brianchairmonte@ongov.net. Term: This is a one-time purchase. This agreement shall commence on April 3, 2024 and shall continue until the project is complete, unless terminated earlier. Furnish Steam and Condensate Piping Replacement - McCarthy at Beard School Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - Prevailing Wage Required - Warranty Information Required The City of Syracuse School District reserves the right to reject any or all bids. o Contractor shall abide by all OSHA Rules and Regulations including all applicable Covid -19 rules and regulations per New York State. All workers must adhere to all required safety measures when in any building and while working. o The Contractor shall remove all service materials and debris from the site when the work included in the Contract is completed and leave the site in a neat, restored condition. The Contractor shall thoroughly clean the work completed under the Contract and leave in a bright and new condition. The Contractor shall provide all labor, materials, and equipment to load, transport and dispose of refuse at no additional cost to the County. o Contractor is responsible for all appropriate signage necessary when working. o The Contractor shall furnish, if required in the Request for Bid, all labor, materials, installed equipment, tools, scaffolding, shoring, bracing, appliance and equipment necessary to perform and safely complete the work under the Contract, and within the time specified. o The Contractor represents and warrants that he/she is familiar with all Federal, State, County and Municipal Laws, ordinances, and regulations, which may in any way affect the work or those employed therein, including, but not limited to, any special acts relating to the work or to the project of which it is a part. The Contractor shall be solely responsible for complying with the requirements of all applicable Federal and State Occupational Safety and Health Act provisions and requirements of any and all other laws, rules and regulations pertaining to employee health, safety and accident prevention Remove and replace steam and condensate piping on the heating system as well as complete related work at McCarthy at Beard School in accordance with attached technical specifications and drawings prepared by Building Energy Solutions (BES). McCarthy at Beard School is located at 220 West Kennedy Street Syracuse, NY 13205.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.