Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

March 4, 2024

September 6, 2024

To Be Determined

Renovation, Site Work

No Information to Display

$508,000.00

Public - City

img_map_placeholder

To Be Determined, Shell Rock, IA

Subscribe to View Full Documents

Work in general involves removal and land application of sewage sludge from the existing aerated lagoon wastewater treatment plant, installing new air laterals and diffusers and installing a new blower in the City of Shell Rock, Iowa. Est. Value- $ 508,000.00 Work on the improvement may be commenced upon approval of the contract by the Council and be completed as stated below. Contractor shall fully complete the project by September 6, 2024. Liquidated Damages in the amount of $600.00 per Calendar Day will be assessed for each Calendar Day that any work shall remain uncompleted beyond the specified completion date allowed. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount of 5% of the total bid amount including all add alternates and shall be the Jurisdiction's bidder's bond with corporate surety satisfactory to the Jurisdiction. No other type of bid security will be accepted. The bidder's bond shall contain no condition except as provided in the specifications. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and the maintenance of said improvements in good repair from the time of acceptance of the improvements by the City for not less than two (2) years. The City of Shell Rock reserves the right to reject any and all bids. Document note: Hard copies of the bid documents may also be obtained and examined from the office of the Engineer, 221 East Main Street, Suite 301, Manchester, Iowa 52057 (phone number 563.927.2060, e-mail aries@fehrgraham.com). There is a one hundred-dollar ($100.00) deposit for hard copies of the plans and specifications, which will be refunded if returned to the Engineer in reusable condition within fourteen (14) days of the award of the Contract. Downloading the electronic bid documents is required from online in order to submit an online bid even if hard copy plans are purchased from the office of the Engineer.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects