Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 11, 2024

May 10, 2024

W Starr Pass Blvd

New Construction, Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

W Starr Pass Blvd, Tucson, AZ

6

5

3

Subscribe to View Full Documents

Prop 411 Collector Streets - Starr Pass Blvd and Players Club Dr Reconstruction - The proposed work is located in the City of Tucson city limits. The work under this project includes milling, pavement preparation, and paving of streets for the location. The proposed work is along Starr Pass Blvd and Players Club Dr roadways. PRICE RANGE: Between $1,000,000 and $5,000,000 SBE (3%) QUESTIONS SHALL BE DIRECTED TO: Questions received less than ten (10) days prior to the date of Bid Opening may not be answered. Leticia Riesgo (520) 837-4138 leticia.riesgo@tucsonaz.gov All work is to be completed within 60 consecutive calendar days from the date of the notice to proceed.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.