Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 6, 2024

March 6, 2024

May 5, 2025

1 Helvey Park Dr

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

1 Helvey Park Dr, Smithville, MO

26

22

2

3

Subscribe to View Full Documents

The Work on the base bid includes, but is not limited to, the following: 1. Replacement of existing pneumatic valve actuators with electric valve actuators within the filter pipe gallery. 2. Replacement of influent mud valves for Filters No. I and No. 4. 3. Removal and replacement of existing filter media within Filter No. 1 through 5. 4. Replacement of Filter No. 3 underdrain. 5. Demolition of the bubbler system and installation of new level switch at the Transfer Pump Wet Well. 6. Replacement of turbidimeter taps within the Filter Gallery. 7. Replacement of the existing Lime and Powder Activated Carbon (PAC) chemical feed equipment and dust collection systems. 8. Relocation of select pipe supports and replace of select U-Bolts associated with the Submerged Launder Pipe for Secondary Clarifier No. 2. 9. Replacement of doors at the PAC and Chlorine dioxide rooms. 10. Associated Demolition, Structural, Architectural, Electrical, and I&C work. The Work on the alternate bids includes, but is not limited to, the following: 1. Alternative 1: Replacement of Filter No. 1 and 2 valves within filter pipe gallery. 2. Alternative 2: Replacement of Filter No. 3, 4, and 5 valves within filter pipe gallery. 3. Alternative 3: Preparation and re-coating of all exposed process piping, valves, fittings, and nuts and bolts in filter pipe gallery and transfer pump rooms. A Bid must be accompanied by bid security made payable to Owner in an amount of five (5) percent of Bidder s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Direct all questions to Derek Patrick at HDR at derek.patrick@hdrinc.com

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects