Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 9, 2024

No Information to Display

1 HACC Dr

Renovation

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

1 HACC Dr, Harrisburg, PA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Project consists of the complete decommissioning of the two existing swimming pools in the J. Evans Physical Education Building on the HACC main campus, including the compete infill of the training/lap pool and the diving pool located in the 1970 addition to the original physical education structure. The work includes the complete infill of the existing swimming pool vessels, the removal of the existing swimming pool support systems including the filtration, recirculation, and sanitation systems, including all associated piping, hangers, and supports, all electrical service to all pool related equipment, and associated conduits, and wiring back to the source of power. Incidental domestic water plumbing components serving the pools will also be removed to the source of potable water and capped for future reconnections. All demolition and removal of all incidental plumbing, and electrical systems service the existing swimming pools shall be included. Only loose or compromised existing ceramic tile and setting bed material in the natatorium area is to be removed to sound concrete suitable for the placement for a new concrete uniform floor slab suitable for future renovations. All other sound ceramic tile is to remain in place for subsequent concrete floor slab placement. The project is intended to produce a space suitable for future repurposing by the College with functions appropriate to the educational program and curriculum offered in the J. Evans Physical Education Building. The restoration and stabilization of finishes and other architectural elements for future renovation and other Work are indicated in the Contract Documents. The work is not intended to produce a finished space, rather, the work is intended to produce an environment suitable for future upgrades to be performed later. The college has removed all pool related stainless-steel rail goods and bleacher seating. All remaining elements are to be demolished and removed from the space and properly discarded. Questions Due Date Online Portal The Q and A Period for this Opportunity is Ongoing Never

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects