Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 23, 2024

February 22, 2024

April 22, 2024

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Midland, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000338719 To provide the City of Midland with pricing on cost to perform cured-in-place pipe lining on various pipes and manholes withing the sanitary sewer collection system in accordance with specifications and standard instructions. Technical questions shall be directed to Ryan Ives, Collections and Maintenance Supervisor, Water Reclamation Plant at 989-837-3507. Install approximately 1860 of 8 diameter liner, installed through seven sections of storm sewer. Install approximately 600 of 10 diameter liner through two section storm sewer. Install approximately 450 of 15 diameter, installed through 2 section of storm sewer. Install approximately 525 of 21 diameter liner in two stretch of storm sewer, and install approximately 180 of 24 diameter liner, installed through 1 continuous section of storm sewer. Bid should be submitted in a sealed envelope clearly marked as BID 4406 LINING PROJECT Install approximately 1860 of 8 diameter liner, installed through seven sections of storm sewer. Install approximately 600 of 10 diameter liner through two section storm sewer. Install approximately 450 of 15 diameter, installed through 2 section of storm sewer. Install approximately 525 of 21 diameter liner in two stretch of storm sewer, and install approximately 180 of 24 diameter liner, installed through 1 continuous section of storm sewer Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A certified check or bid bond for a sum of not less than five percent (5%) of the amount of the Proposal will be required with each bid. The City reserves the right to accept or reject all or any parts of any and all bids, to waive irregularities and to award in the best interests of the City of Midland.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.