Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

March 4, 2024

No Information to Display

Multiple Locations

Addition, Demolition, Renovation, Site Work

No Information to Display

$3,600,000.00

Public - County

img_map_placeholder

Multiple Locations, Bedford, TX

128

35

2

Subscribe to View Full Documents

For the furnishing of all labor, materials, and equipment, and performing all work required for Hurst Junior High School Administration Addition & 2100 Plaza Parkway Renovation for Hurst-Euless-Bedford ISD, Hurst and Bedford, Texas, and in compliance with Project manual and drawings, and other contract documents as prepared by Huckabee The project, as currently planned, consists of a vestibule addition near the main entrance at the existing Hurst Junior High School in Hurst, Texas. The total footprint of the addition will be on the order of 2,200 square feet. Maximum column loads of 300 kips are anticipated. Plate A.1, Plan of Boring, presents the project vicinity and approximate locations of the exploration boring. The purpose of this geotechnical engineering study has been to determine the general subsurface conditions, evaluate the engineering characteristics of the subsurface materials encountered, and develop recommendations for the type or types of foundations suitable for the project. To accomplish its intended purposes, the study has been conducted in the following phases: (1) drilling a sample boring to determine the general subsurface conditions and to obtain samples for testing; (2) performing laboratory tests on appropriate samples to determine pertinent engineering properties of the subsurface materials; and (3) performing engineering analyses, using the field and laboratory data to develop geotechnical recommendations for the proposed construction. The design is currently in progress and the location and/or elevation of the addition could change. Once the final design is near completion (80-percent to 90-percent stage), it is recommended that CMJ Engineering, Inc. be retained to review those portions of the construction documents pertaining to the geotechnical recommendations, as a means to determine that our recommendations have been interpreted as intended. Part A: Tuesday, January 30, 2024 at 2:00 p.m. Part B: Wednesday, January 31, 2024 at 2:00 p.m. BUDGET - $3,600,000 CONTACT INFORMATION: Gary Kerbow - garykerbow@hebisd.edu A Cashier's Check, Certified Check, or acceptable Bidder's Bond payable to the Hurst-EulessBedford ISD, in the amount of not less than 5% of the largest possible total for the proposal submitted, must accompany each proposal in Part "A" of the Proposal submission. The successful Proposer will be required to enter into a contract with the Hurst-Euless-Bedford ISD and to furnish a Performance and Payment Bond of approved form through an approved bonding company duly authorized to do business in the State of Texas, and currently listed in the Department of Treasury Federal Register, in the amount of not less than 100% of the contract price, conditioned upon the performance of the contract. Performance and Payment Bonds shall be in full compliance with Texas Government Code Chapter 2253. AIA Bonds (AIA Document A312) do not comply. Bonding Companies using "Reinsuring Insurance Companies" to expand the Bonding Companies Bonding Limits will not be acceptable unless also approved by the Owner All questions regarding clarification or interpretation of the CSP will be submitted in writing by the Proposer, and must be received by 5:00 P.M., JANUARY 23, 2024. No questions will be addressed unless provided in writing. All correspondence pertaining to this CSP will be addressed to: Gary Kerbow, Hurst-Euless-Bedford Independent School District, Purchasing Department, 1849A Central Drive, Bedford, Texas 76022, email: garykerbow@hebisd.edu, fax: 817-354-3558. Inquiries about the project and CSP document should be addressed in writing, either by facsimile or by e-mail. Verbal requests for clarification or additional information will not be addressed and will not be binding. Addenda are written or graphic instruments issued prior to the execution of the contract which modify or interpret the proposal documents, including drawings and project manual, by additions, deletions, clarifications or corrections and should be acknowledged by the Proposer on the Proposal form. Addenda will become part of the contract documents when the construction contract is executed. If awarded the contract, the undersigned agrees to complete the contract in _____ consecutive calendar days from notice to proceed. Assume notice to proceed to be issued on or about March 4, 2024 for scheduling purposes.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.