Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2024

March 13, 2024

July 19, 2024

Evergreen Ln

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Evergreen Ln, Gladstone, OR

8

5

2

Subscribe to View Full Documents

Evergreen Lane Storm Drain Project. This Project Will Involves the Replacement of 393 Feet of Failed 18" Storm Line, Which is the Last Segment of the Storm water Conveyance System Contributing to The Evergreen Lane Storm water Outfall, Which is Currently Severely Obstructed by a Large Tree. The Project Will Also Involve the Installation of Maintenance Access Manholes and a Relocation of the Outfall to a Conveniently Accessible Location Where It May Flow Freely. Temporary Protection & Direction of Traffic, One-Call and Pothole Existing Utilities, Clearing and Grubbing Removal and Replacement of Topsoil, Removal of Pavement, Curbs, Driveways, and Sidewalks All Restoration and Cleanup Storm Drainage Improvements- 18 Inch HDPE Pipe, 18 Inch Ductile Iron Pipe , Install Concrete Manhole provided by City, Removal of Existing Pipes, Connection to Existing Structures, Drainage Berm Embankment, Rip rap outfall pad Street Improvements - Resurfacing - A.C. Pavement , Resurfacing - Driveway Rock Surfacing If you have any questions, please contact this department at 503-656-7957. Addenda From These Meetings, if Any Will Be Provided No Later Than the End of Business on February 1, 2024 to Any and All Registered Planholders. COMMENCEMENT DATE: Shall occur following Issuance of Notice to Proceed ("NTP") but not prior to March 13, 2024 Substantial completion shall be no later than July 1, 2024 or within 90 business days from the start of Work, final completion shall be no later July 19, 2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.