Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
February 1, 2024
March 4, 2024
No Information to Display
301 E Clark Ave
Renovation
No Information to Display
$1,160,000.00
Public - County
301 E Clark Ave, Las Vegas, NV
The Project of which the Work of the Contract is a part titled Clark Place Rooftop Cooling Tower & Boiler Replacement and is located at 301 E. Clark Ave., Las Vegas, Nevada 89101. The Work is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. SQFT 119,634 The Work consists of removal and replacement of rooftop cooling tower, rooftop boiler, associated pumps, piping, supports, electrical, controls and other work required for successful operation of the system. ESTIMATED COST: $1,102,000.00 - $1,160,000.00. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: These requirements include but are not limited to; payment and changes in the work, supervision, project coordination, construction schedule, temporary facilities and controls, on-site construction management, project completion and closeout. Work at existing cooling tower consists of preparation of area by demolition of tower, piping, pumps, valves, supports, emergency eyewash and shower station, and appurtenances for installation of cooling tower, pump, basin sweeper, support, controls, piping, valves and devices required for successful operation of the system. Work at existing boiler consists of preparation of area by demolition of boiler, piping, pump, valves, expansion tank, controls, supports and appurtenances for installation of boiler, pump, expansion tank, support, controls, piping, valves and devices required for successful operation of the system. Electrical work includes power distribution and service to all HVAC equipment and controls. Demolition work required at cooling tower and boiler systems and demolition motor control center inside electrical room and removal of all unnecessary and abandoned electrical boxes and conduits. Testing, adjusting and balancing of the hydronic systems. System commissioning per requirements of contract documents. Integration of the new and existing BACnet control system. Question Deadline 01/18/2024 at 5:00 PM PT Special provisions, technical specifications, or drawings and management of construction project after award Clark County Real Property Management Faye Infuso Fayem@clarkcountynv.gov Invitation to Bid, Bonds, insurance requirements (Purchasing Analyst) Clark County Purchasing and Contracts Division Geraldine Cruz Geraldine.Cruz@clarkcountynv.gov 606934-23 (702) 455-6277 Management of construction project after award Construction Project Management Supervisor Clark County Real Property Management Fernando Martinez Fernando.Martinez@clarkcountynv.gov RP.D0923023 (702) 455-5844 (702) 455-5817 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Las Vegas, NV
Bid Date: Feb 15 2024
Las Vegas, NV
Bid Date: Feb 01 2024
Las Vegas, NV
Bid Date: Feb 15 2024
Las Vegas, NV
Bid Date: Jan 16 2024
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Jan 29 2024
Las Vegas, NV
Bid Date: Feb 05 2024
Las Vegas, NV
Bid Date: Feb 09 2024
Las Vegas, NV
Bid Date: Dec 05 2023
Las Vegas, NV
Bid Date: Nov 24 2020
Las Vegas, NV
Bid Date: Jan 10 2022
Las Vegas, NV
Bid Date: Feb 09 2023
Las Vegas, NV
Bid Date: Oct 20 2023
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Dec 30 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
