Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

March 4, 2024

No Information to Display

301 E Clark Ave

Renovation

No Information to Display

$1,160,000.00

Public - County

img_map_placeholder

301 E Clark Ave, Las Vegas, NV

Subscribe to View Full Documents

The Project of which the Work of the Contract is a part titled Clark Place Rooftop Cooling Tower & Boiler Replacement and is located at 301 E. Clark Ave., Las Vegas, Nevada 89101. The Work is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. SQFT 119,634 The Work consists of removal and replacement of rooftop cooling tower, rooftop boiler, associated pumps, piping, supports, electrical, controls and other work required for successful operation of the system. ESTIMATED COST: $1,102,000.00 - $1,160,000.00. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: These requirements include but are not limited to; payment and changes in the work, supervision, project coordination, construction schedule, temporary facilities and controls, on-site construction management, project completion and closeout. Work at existing cooling tower consists of preparation of area by demolition of tower, piping, pumps, valves, supports, emergency eyewash and shower station, and appurtenances for installation of cooling tower, pump, basin sweeper, support, controls, piping, valves and devices required for successful operation of the system. Work at existing boiler consists of preparation of area by demolition of boiler, piping, pump, valves, expansion tank, controls, supports and appurtenances for installation of boiler, pump, expansion tank, support, controls, piping, valves and devices required for successful operation of the system. Electrical work includes power distribution and service to all HVAC equipment and controls. Demolition work required at cooling tower and boiler systems and demolition motor control center inside electrical room and removal of all unnecessary and abandoned electrical boxes and conduits. Testing, adjusting and balancing of the hydronic systems. System commissioning per requirements of contract documents. Integration of the new and existing BACnet control system. Question Deadline 01/18/2024 at 5:00 PM PT Special provisions, technical specifications, or drawings and management of construction project after award Clark County Real Property Management Faye Infuso Fayem@clarkcountynv.gov Invitation to Bid, Bonds, insurance requirements (Purchasing Analyst) Clark County Purchasing and Contracts Division Geraldine Cruz Geraldine.Cruz@clarkcountynv.gov 606934-23 (702) 455-6277 Management of construction project after award Construction Project Management Supervisor Clark County Real Property Management Fernando Martinez Fernando.Martinez@clarkcountynv.gov RP.D0923023 (702) 455-5844 (702) 455-5817 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects