Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2024

March 15, 2024

May 24, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$350,000.00

Public - City

img_map_placeholder

Multiple Locations, Avon, CO

Subscribe to View Full Documents

Reference Number 0000338401 Job Location Avon, Colorado This bid is for a package of 4 projects all including asphalt trail work. The first project is in the southwest corner of Nottingham Park and will entail reconstructing the trail to improve accessibility and extending a new leg of the recreation path west to W. Beaver Creek Blvd. along railroad right of Way. The project will also include landscaping, utility relocations, and drainage improvements. The remaining set of three projects are asphalt repair and maintenance along existing recreation trails within the Town of Avon. The Project Area maps show the general location of the path segment to be worked within. The Asphalt Patching areas are located within the segments shown in blue on the map and the approximate patching locations are schematically shown with red pins. The field location of the asphalt patching will be marked with spray paint in coordination with the Town of Avon. 1.Project Area 1 Hurd Lane Recreation Path: This section of recreation path extendsalong Hurd Lane from Avon Road to the connection with Eagle Bend Drive. Thenn extending to the intersection with Stonebridge Road. Additionally, the asphalt pathalong Stonebridge Road ending at the bridge. 2.Project Area 2 Eagle Valley Trail (West): This section of the Eagle Valley Trail extends from the Town Boundary to West Beaver Creek Boulevard. 3.Project Area 3 Eagle Valley Trail (Central): This section of the Eagle Valley Trail extends from West Beaver Creek Boulevard to the Avon Road Bridge. Question Acceptance Deadline 01/22/2024 02:00 PM EST Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % A certified check or bank draft, on a responsible, solvent bank, or a satisfactory Bid Bond executed by the Bidder and a recognized Colorado licensed Surety Company, payable to the Town of Avon, Colorado, in the amount of not less than five percent (5%) of the total bid, The Town of Avon reserves the right to reject any and all bids, to waive any informality in bidding, and to make Award in such a manner as they may deem right and proper for the best interest of the Town of Avon. *Construction Period March 15 - May 24, 2024

53 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.