Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 10, 2025

February 26, 2024

No Information to Display

Multiple Locations

Demolition, Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

Multiple Locations, Winnipeg, MB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Work to be done under the proposed Contract shall consist of the small building demolition in City owned and/or operated buildings at the direction of the Contract Administrator for the period from date of award to February 28, 2028. Level I Demolition The Work to Be Done Under the Subsequent Contract Shall Consist of the Demolition of Small Buildings. (a) the Work Shall Be Done on an as Required Basis During the Term of the Contract. (I) the Type and Quantity of Work to Be Performed Under This Contract Shall Be as Authorized From Time to Time by the Contract Administrator and/or Users. (Ii) the City Shall Have No Obligation Under the Contract to Purchase Any Quantity of Any Item in Excess of Its Actual Operational Requirements. (B) the City Will Have Arranged to Have the Gas and Hydro Connections Disconnected and Meters Removed by Others. (C) the City Reserves the Right to Add or Delete Contractors During the Period Stated in D2.1 in the Best Interest to the City. (D) Demolitions Shall Be Performed in Accordance With (Canadian Standards Association (Csa International) Standard; Csa S350-m1980 (R2003), Code of Practice for Safety in Demolition of Structures. (E) Contractors Shall Obtain the Necessary Service Permits From the Citys Public Works Department, Cut-off and Abandoned All Existing Sewer and Water Pipes, Including Having Arranged for an Inspection of the Cut-offs by the Citys Water and Waste Department Level Ii Wet Demolition The Work to Be Done Under the Proposed Contractor Shall Consist of Wet Demolitions of Small Buildings. (a) the Work Shall Be Done on an as Required Basis During the Term of the Contract. (I) the Type and Quantity of Work to Be Performed Under This Contract Shall Be as Authorized From Time to Time by the Contract Administrator and/or Users. (Ii) the City Shall Have No Obligation Under the Contract to Purchase Any Quantity of Any Item in Excess of Its Actual Operational Requirements. (B) the City Will Have Arranged to Have the Gas and Hydro Connections Disconnected and Meters Removed by Others. (C) the City Reserves the Right to Add or Delete Contractors During the Pre-qualification Period in the Best Interest to the City. (D) Demolitions Shall Be Performed in Accordance With (Canadian Standards Association (Csa International) Standard; Csa S350-m1980 (R2003), Code of Practice for Safety in Demolition of Structures. (E) Contractor Shall Obtain the Necessary Service Permits From the Citys Public Works Department, Cut-off and Abandoned All Existing Sewer and Water Pipes, Including Having Arranged for an Inspection of the Cut-offs by the Citys Water and Waste Department. (F) the Trees on Site Must Be Protected According to the Citys tree Protection During Construction Specifications. These Specifications Can Be Found on the City (G) Use Wet Demolition Procedures When the Building is Deemed Unsafe to Enter and Asbestos Containing Materials or Other Hazardous Materials Are Suspected to Be in the Building to Be Demolished. The Major Components of This Work Include: (I) Demolishing the Building in a Controlled Manner Using Proper Asbestos Removal Procedures. (Ii) Control Any Water Runoff. (Iii) Provide Temporary Dust Screens, Covers, Railings, Support or Other Protection as Required. (Iv) Follow All Safety Procedures Outlined by the Authorities Having Jurisdiction. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.