Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2024

April 1, 2024

November 30, 2024

MN-25

Outdoor Lighting, Paving, Site Work

No Information to Display

$4,000,000.00

Public - State/Provincial

img_map_placeholder

MN-25, Buffalo, MN

Subscribe to View Full Documents

County: Multiple Site Directions: In Sherburne and Wright Counties on T.H. 25 from East River St to 278 Ft South of Park Blvd SE Grading, Bituminous Surfacing, Lighting and Bridge No. 71012 DBE 12.9 7104-22 (T.H. 25=25) NHPP 0025(005) In Sherburne and Wright Counties on T.H. 25 from East River St to 278 Ft South of Park Blvd SE Grading, Bituminous Surfacing, Lighting and Bridge No. 71012 0.298 Miles MNDOT - 020 - Grading, Bituminous Surfacing, Lighting and Bridge No. 71012 The furnishing of all labor, materials, equipment, and other incidentals necessary or convenient to the successful completion of the project and the carrying out of all the duties and obligations imposed by the contract upon the contractor. Also used to indicate the construction required or completed by the contractor. A. These provisions shall apply to this contract, which is funded in whole or in part with federal funds9 and state funds. B. These provisions shall apply to the prime contractor and all subcontractors contracting to do all or part of the work under this contract. C. The provisions established in this document do not necessarily represent all federal, state, and local laws, ordinances, rules and regulations. It is the responsibility of the prime contractor to inform itself and all subcontractors about other regulations that may be applicable to this contract. D. The prime contractor is responsible to ensure that each subcontractor performing work under this contract receives copies of all required contract provisions.12 These provisions shall be incorporated into written subcontracts and must be displayed on the poster board. E. The department shall administer this contract in accordance with all applicable federal regulations, state statutes and rules14, along with the plans, specifications and provisions, which are incorporated into and found elsewhere in this contract. Direct questions about this Project, including pre-bid questions, to Mike Klasen at 320-248-2294 and michael.klasen@state.mn.us

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.