Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

February 29, 2024

June 27, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$250,000.00

Public - City

img_map_placeholder

Multiple Locations, Golden Valley, MN

Subscribe to View Full Documents

the furnishing of all labor and material for the construction of the 2024 Pavement Management Program. Major quantities for the Work include. Description Quantity Unit Salvage/Remove Bituminous Pavement 17,700 SY Remove Concrete Pavement 7,100 SY Clearing/Grubbing 35 TREE Common Excavation 29,200 CY Select Granular Borrow 39,300 TONS Class 5 Aggregate Base 10,800 TONS Bituminous Mixture 5,300 TONS 4"-6" Concrete Walk 8,100 SF Concrete Curb and Gutter 12,500 LF 6" Concrete Driveway Pavement 2,200 SY Sanitary Sewer Lining 5,300 LF Sanitary Sewer Service Wye Grouting/Liners 83 EA Sodding with 4-Inches of Topsoil 19,000 SY 6"-8" PVC (C-900) Water Main 6,100 LF 6"-8" Gate Valve and Box 29 EA F&I Hydrant 11 EA 15"-27" Reinforced Concrete Storm Sewer Pipe 1,900 LF Drainage Structures & Castings 44 EA The City of Golden Valley reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Golden Valley. Bid security in the amount of 5 percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. * The Bidding Documents are available for viewing by appointment only. Please call the City of Golden Valley Engineering Department at 763-593-3987 to schedule an appointment at the following location: City of Golden Valley Engineering Department - 7800 Golden Valley Road Golden Valley, MN 55427-4588 Substantially Completion- September 27, 2024 Final completion - June 27, 2025 The project is located inside the approximate quadrant of 23rd Avenue, Winnetka Avenue, Duluth Street and Wisconsin Avenue in Golden Valley, Minnesota. The list of streets included in this project include: o Wisconsin Avenue o Orkla Drive o Valders Avenue o Winnetka Heights Avenue o West Bend Road o Duluth Street The project consists of reconstructing the existing streets and replacing the storm sewer as necessary. Watermain is also to be replaced at select locations.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects