Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

February 26, 2024

June 25, 2024

9152 Comar Dr

Renovation

No Information to Display

$600,000.00

Public - City

img_map_placeholder

9152 Comar Dr, Walker, LA

Subscribe to View Full Documents

Interior Build-out for Walker Animal Shelter Questions about this procedure shall be directed to: Centerline - Phone: 504-291-5738, Email: bidconnect@centerline.co. All questions regarding the Bid Documents and any substitution requests shall be submitted to KERN ARCHITECTS, attn PHILLIP KERN via Centerline online by 2:00 local time on THURSDAY, JANUARY 4TH. Responses will be posted via Addendum on Electronically by 2:00 PM local time on MONDAY, JANUARY 8TH. A Bid bond will be required, per the contract documents, and should be uploaded with the rest of the required Bid Documents. If a scanned copy of the Bid Bond is uploaded, the original notarized bid bond must be produced "on-demand" per the Owner's request. No Bidder may withdraw his bid within forty-five (45) days after the actual date of the opening thereof; except as prescribed in R.S. 38:2215B. As a requirement under Louisiana Revised Statutes 37:2156.2, this project is classified as Building Construction. Contractor shall submit sealed written bid or electronic bid as per the Instructions to Bidders. In accordance with R.S. 38:2212 (A)(1)(b), the provisions and requirements stated in the Advertisement for Bids and those required on the Bid Form shall not be considered as informalities and shall not be waived. Bidder must comply with provisions of RS 38.2212.10. Construction contract duration shall be 120 consecutive calendar days. Liquidated damages shall be assessed in the amount of $250.00 per calendar day.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects