Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 24, 2024

March 25, 2024

September 16, 2024

13th Ave NW

Paving, Site Work

No Information to Display

$2,200,000.00

Public - City

img_map_placeholder

13th Ave NW, Seattle, WA

Our team is requesting plans for this project.

Subscribe to View Full Documents

PROJECT DESCRIPTION: Seismic retrofit project that involves retrofit of superstructure, columns, and footings through section build up and/or use of CFRP wraps, as well as separating ramps from the structure and building up a lightweight fill support for ramps, adding new expansion joints at the ramps, removing and reinstalling handrails and modifying the ends of handrails at new expansion joints. PROJECT LOCATION: The Delridge Way SW Pedestrian Bridge is located at the intersection of Delridge Way SW and SW Oregon St in the North Delridge Neighborhood. PROJECT LOCATION: Crown Hill, Holman Road NW at 13th Avenue NW. A/E ESTIMATE: $1,300,000 to $1,500,000 QUESTIONS: Questions must be emailed by 5:00pm, 3 Business Days before Bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. TIME OF COMPLETION Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 110 WORKING DAYS LIQUIDATED DAMAGES If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages. CLARIFICATION DEADLINE 1/19/2024 5:00 PM

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects