Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

February 9, 2024

February 24, 2024

10 Pearl St

Renovation

No Information to Display

$10,000.00

Public - City

img_map_placeholder

10 Pearl St, Stoughton, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Remove existing stair treads on both the north and south stairwells located at Town Hall Estimated Cost $10,000 Replace with new full length treads that shall have an anti-slip surfacing at the nosing of each Questions regarding the quote request are to be asked in writing and sent to bids@stoughton-ma.gov Using MGL 149 to provide labor, materials, equipment, transportation and supervision necessary for the work at the Stoughton Town Hall located at 10 Pearl Street, which includes removing existing stair treads on both the north and south stairwells. Replace with new full length treads that shall have an anti-slip surface at the nosing of each

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.