Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

March 25, 2024

No Information to Display

1001 Allison Dr

Site Work

No Information to Display

$4,700,000.00

Public - City

img_map_placeholder

1001 Allison Dr, Vacaville, CA

41

6

2

3

Subscribe to View Full Documents

Federal Disadvantaged Business Enterprise (Dbe) Goal Of 5.4% Bid Bond Of 10% Of The Bid Amount Performance Bond Of 100% Of The Contract Price Payment Bond Of 100% Of The Contract Price Question Deadline 01/17/2024 at 5:00 PM PT Written pre-bid questions of Bidders (including subcontractors and material suppliers) will be the only prebid questions that receive an official response from the City. Written questions shall be submitted: a) By E-mail to the Citys designated Project Manager, Amer Rihani at amer.rihani@cityofvacaville.com; or b) By Letter addressed to: ELECTRIC BUS CHARGING STATION INFRASTRUCTURE (CIP 1008) City of Vacaville Public Works Department 650 Merchant Street Vacaville, CA 95688 Engineer's Estimate: $4,700,000 The general description of work includes but not limited to: furnish and install parking canopies with integrated solar PV system, install City furnished twelve (12) electric vehicle (EV) chargers consisting of twelve power cabinet and twenty-four depot charging boxes, contractor is responsible to coordinate with PG&E, obtain permits, and pay fees related to new electrical service, provide and install all electrical distribution including 480V service switchboard MSB, furnish and install all underground electric conduit and conductors, furnish and install all structural and civil work related to the project, partially remove existing Compressed Natural Gas (CNG) lines and pumping stations, provide required warranties, and all required miscellaneous work to complete the project as shown in the plans and the project special provisions. The Contractor shall possess a Class A license at the time a bid is submitted for this Project.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.