Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

February 9, 2024

No Information to Display

To Be Determined

Site Work

No Information to Display

$100,000.00

Public - County

img_map_placeholder

To Be Determined, Belmont, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Gaston County operates Southpoint Access, a park located at Lake Wylie in Belmont, which offers walking trails, fishing piers, picnic shelters, restrooms, event shelters, and a sand beach. NC Wildlife Resources Commission operates a boat launch area at Southpoint Access. Duke Energy is currently constructing a canoe and kayak launch with associated parking along the east shore of the park. In order for Gaston County to better oversee and operate the park, a pre-fabricated guard shack will be installed along Boat Launch Rd. The site will need to be designed to prepare for the installation of the guard shack, including utility connection and widening of the road to allow for entering and exiting traffic. Deadline for Questions - Any questions shall be submitted by 4:00 P.M. Friday, January 5, 2024 via email to: rebecca.edison@gastongov.com The delivery method for the Project will be Design-Bid-Build. The selected engineer will be required to provide a full range of design services for a fully usable, operational, and code compliant facility that satisfies the County's project requirements, including but not limited to: o Site and utility design for pre-fab guard building; o Design for widening of existing entrance to the park; o Boundary, utility, and topographical survey; o Conducting regular meetings with appropriate County stakeholders; o Coordination with City of Belmont and Duke Energy for utility connections; o Coordination with pre-fab manufacturer for specs; o Preparing detailed cost estimates; o Preparing construction documents for permitting and bidding; Submitting for permits required for compliance with local, state and federal requirements; o Preparing a construction phasing plan to meet the County's needs; o Bidding administration; o Construction administration including pre-fab building installation and connections to utilities; o Special Inspections and Material Testing; and o Closeout

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.