Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 23, 2024

September 23, 2024

October 27, 2027

10 C. Casia

Paving, Renovation, Site Work

No Information to Display

$57,533,000.00

Public - Federal

img_map_placeholder

10 C. Casia, San Juan, PR

745

41

113

9

Subscribe to View Full Documents

Work includes general construction, infrastructure upgrades, reconfiguring and renovating existing spaces impacted by or said improvements. Infrastructure upgrades include electrical, bonding, UPS, building management system interfaces, HVAC, communication, physical security upgrades, and fiber infrastructure backbone campus wide. Within each and in between the buildings, which will include modification that may impact roads, walks, grading, drainage, and other existing utilities. Data Center WAN updates and hazardous material abatement. Project Buildings are 1, 2, 10, 19, 20, 26, 29, 30, 40, 50, 51, 52, 53, 54, 60, and any associated work in other buildings as indicated. Project Number: 672-21-700 The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades Construction project, in accordance with the attached Specifications and Drawings. The project is located at the: San Juan VA Medical Center 10 Calle Casia San Juan, PR 00921 Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Thomas Council. Questions shall be submitted only via e-mail to: thomas.council@va.gov. The subject line must read: San Juan - EHRM Infrastructure Upgrades - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS May 28, 2024 at 10:30 PM AT. VAAR Magnitude of Construction: $50,000,000 to $100,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Responses to technical questions. See attachment titled Technical Questions - FINAL - San Juan - 6-28-24.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects