Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

March 11, 2024

March 11, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$2,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Houston, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Work of the contract is for constructing new sidewalks, removing existing damaged and non-compliant sidewalks and wheelchair ramps; and constructing new 5-feet wide, 4 1/2-thick concrete sidewalks, walkways, curbs, and wheelchair ramps.and constructing new 5-feet wide, 4%-inch thick concrete sidewalks, walkways, curbs, curb & gutters, and wheel chair ramps as directed by the engineer. In accordance to the Houston Public Works Infrastructure Design Manual and Guidelines for the Safe Sidewalk Program latest edition. The work to be performed shall consist of furnishing and installing all materials, equipment, excavation, backfill, grading, sodding or paving of disturbed areas, disposal of all debris and surplus excavation materials, and the demolition of existing facilities necessary to complete sidewalks, and wheel chair ramps as directed by the engineer. Protecting and relocating driveways, culverts, signs, mail boxes, shrubs, trees and bushes. Removing and replacing retaining walls and headwalls Relocating water meters outside of sidewalk. Protecting and relocating sprinkler heads and all accessories. Adjusting manhole frames and water valves to finished sidewalk grade Asphalt milling and replacement for ramps at existing curbs Installation of Asphalt transition and drains pipes. Remove and replace damaged yard drains. Other related work identified on the work order. Removing and replacing drainage culverts The Q/A feature is not enabled for this project. Substantial Completion within 365 days after Date of Commencement of the Work, subject to adjustments of Contract Time as provided in the Contract. the MBE goal is 12.94 percent, and the WBE goal is 8.72 percent.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects