January 11, 2024
March 11, 2024
March 11, 2025
Multiple Locations
Paving, Site Work
No Information to Display
$2,500,000.00
Public - City
Multiple Locations, Houston, TX
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Work of the contract is for constructing new sidewalks, removing existing damaged and non-compliant sidewalks and wheelchair ramps; and constructing new 5-feet wide, 4 1/2-thick concrete sidewalks, walkways, curbs, and wheelchair ramps.and constructing new 5-feet wide, 4%-inch thick concrete sidewalks, walkways, curbs, curb & gutters, and wheel chair ramps as directed by the engineer. In accordance to the Houston Public Works Infrastructure Design Manual and Guidelines for the Safe Sidewalk Program latest edition. The work to be performed shall consist of furnishing and installing all materials, equipment, excavation, backfill, grading, sodding or paving of disturbed areas, disposal of all debris and surplus excavation materials, and the demolition of existing facilities necessary to complete sidewalks, and wheel chair ramps as directed by the engineer. Protecting and relocating driveways, culverts, signs, mail boxes, shrubs, trees and bushes. Removing and replacing retaining walls and headwalls Relocating water meters outside of sidewalk. Protecting and relocating sprinkler heads and all accessories. Adjusting manhole frames and water valves to finished sidewalk grade Asphalt milling and replacement for ramps at existing curbs Installation of Asphalt transition and drains pipes. Remove and replace damaged yard drains. Other related work identified on the work order. Removing and replacing drainage culverts The Q/A feature is not enabled for this project. Substantial Completion within 365 days after Date of Commencement of the Work, subject to adjustments of Contract Time as provided in the Contract. the MBE goal is 12.94 percent, and the WBE goal is 8.72 percent.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Houston, TX
Bid Date: Jan 11 2024
Houston, TX
Bid Date: Jan 19 2024
Houston, TX
Bid Date: Jan 24 2024
Houston, TX
Bid Date: Jan 23 2024
Houston, TX
Bid Date: Jan 22 2024
Houston, TX
Bid Date: Jan 18 2024
Houston, TX
Bid Date: Jan 10 2024
Houston, TX
Bid Date: Jan 23 2024
Houston, TX
Bid Date: Nov 15 2023
Houston, TX
Bid Date: Nov 14 2023
Houston, TX
Bid Date: Nov 13 2023
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.