Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 10, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Fairfield, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Fairfield-Suisun Sewer District (District) is requesting proposals from qualified firms to develop the final engineering design, prepare environmental documentation, and acquire the permitting necessary for the Kellogg Resiliency Project. This project aims to create a nature-based solution to protect people and property from flooding, optimize infrastructure, provide stormwater treatment, and safeguard a stable and biodiverse future within a Suisun City, California community vulnerable to sea level rise and fire. Questions and Answers - December 19, 2023 The goal of the scope of work described in this RFP is to develop final engineering design documents with cost estimates, coordinate necessary permits and governing agency approvals, prepare environmental documentation, and provide bid period support for Phase 2 of the Kellogg Resiliency Project. This scope of work builds upon the Phase 1, 30% design which is available for download at Kellogg Resiliency Project Design, Engineering, and Permitting Project No. 4001 - Reference Docs. The desired parameters and outcomes for the requested services are: o Integrate community input into final design, where possible. o Review and build upon the 30% Design Package to develop a Final Bid Package for the construction of the Kellogg Resiliency Project. o Prepare construction timelines. o Develop cost estimates for construction for project budgeting purposes. o Identify and develop required inter-agency approvals (permitting requirements and coordination needed) for construction. o Develop environmental documentation for review and adoption. The selected proposing consultant team shall perform the minimum Tasks outlined. Proposing consultant teams will provide a detailed approach and scope of work in its proposal and use such as the basis for its proposed fees. The final scope and fee will be negotiated prior to recommending Contract Award to District management. The method of Contractor Selection has not been Determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.