Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 16, 2024

May 13, 2024

August 9, 2024

1 Whitney Way

Paving, Site Work

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

1 Whitney Way, Sheridan, WY

8

11

4

Subscribe to View Full Documents

Areas of reconstruction, repair, and overlay of the existing campus Golden Dome parking lot. Project includes removal and replacement of areas of deteriorating asphalt pavement. Work requires 1-1/2 thick overlay of approximately 9,750 square yard parking area with paving fabric. Additional work includes removal and replacement of concrete handicap ramps around the parking area. Est. Completion Date: Aug. 9, 2024 Site Directions: Sheridan College Campus 1 Whitney Way Sheridan, WY 82801 Questions regarding this project should be addressed to Rick Estes, PE (307-675-7714; restes@m-m.net) or Jeff Feck, PE (307-675-7715; jfeck@m-m.net), Morrison-Maierle, 1470 Sugarland Drive, Suite 2, Sheridan, WY 82801. 6028.017

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects