Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 1, 2024

April 2, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$4,915,000.00

Public - City

img_map_placeholder

Multiple Locations, Frankfort, KY

255

62

9

3

Subscribe to View Full Documents

DESCRIPTION OF WORK A. The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for the East Frankfort Interceptor Phase III project which includes the installation of approximately 5,000 LF of 42-inch gravity sewers, 985 LF of 66-inch tunnel with 1,026 LF of 48-inch sewer 259 LF of 60-inch sewer, 100 LF of 8-inch sewer, drop shaft structure, and 300 LF of 10-ft hand tunnel, two sets of siphons, three pipes each (one siphon set including 12-inch, 20-inch, and 24-inch pipes approximately 2,700 LF horizontal directional drilled (HDD) under Wilkinson Blvd. and Cove Spring Park and an additional 135 LF of open cut installation, and a second siphon set including 16-inch, 30-inch, and 30-inch pipes approximately 1,500 LF HDD under the Kentucky River and an additional 1,072 LF of open cut installation, precast manholes, a 3 MG prestressed concrete wet weather storage tank, a screening structure, a vortex drop structure, multiple structures with gates and valves, and connection into the E.C. McManis WWTP. All work shown within these Construction Documents is included in this bid and project. Contract Documents may be examined at the following places: Hazen and Sawyer 230 Lexington Green Cir., Suite 520 Lexington, KY 40503 Set Aside(s) MBE (9%), WBE (7%) Charges for all documents obtained will be made at the cost of reproduction. Lynn Imaging may be contacted for a quote of this cost. No bids shall be accepted from parties who are not listed on the official planholder list maintained by Lynn Imaging or the planholder list maintained by DemandStar. Partial copies of plans, specifications, or other contract documents shall not be distributed.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects