Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

March 4, 2024

May 15, 2024

1 Chipman St

Renovation

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

1 Chipman St, St David Ridge, NB

Subscribe to View Full Documents

The work under this Contract includes, but is not limited to the following: .1 Installation of new, stand alone, natural gas fired, hydronic heating system to replace existing steam sytem supplied from adjacent Charlotte County Hospital (CCH) boiler plant. .2 Existing steam heating system to remain operational while new gas fired system is being installed. Contractor to provide exterior temporary packaged boiler system during changeover period if period is to extend more than eight (8) hours. Packaged system to be complete with own fuel source. Temporary non-potable cold water from existing backflow preventor in boiler room. Coordinate on site location of packaged system with Owner. .3 Demolition of existing equipment including but not limited to: steam kettle, supply fan duct steam coils, mechanical room exhaust fan and associated ductwork, condensate lift pump, expansion tank, circulating pumps, shell and tube heat exchanger, air separator, indirect steam domestic hot water tank, and all associated piping, fittings, hangers, trim, etc. .4 Capping existing steam and condensate piping in the basement tunnel from adjacent CCH boiler plant. Existing underground piping from CCH to Lincourt Manor to be abandoned in place. .5 Installation of two (2) new, modulating, condensing natural gas boilers, complete with circulating pumps and all associated trim. Installation of new natural gas piping from meter. .6 New electric duct heating coil for supply fan and associated ductwork. .7 New electric commercial kettle in Kitchen. .8 Two (2) new hydronic circulating pumps. .9 New ductless split air conditioning system installed in mechaincal room. .10 Mechanical work to be coordinated with Electrical so as to maintain pace with the rest of the project. Documents are available through the Construction Association of NB.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.