Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

May 1, 2024

January 31, 2026

Training Field Rd

New Construction, Renovation, Site Work

No Information to Display

$16,600,000.00

Public - City

img_map_placeholder

Training Field Rd, Chatham, MA

Subscribe to View Full Documents

DWSRF ID: 12457 Wells 5 & 8 Water Treatment Plant - Request for Qualifications. The project consists of construction of a new 1.44 MGD water treatment plant that will treat the Town's Well Nos. 5 and 8 located at Training Field Road. Treatment plant will be 7,000 s.f. masonry structure that will remove iron, manganese, and PFAS from the two wells. Project includes new pumps, chemical feed systems, greensand and granular activated carbon filtration vessels, instrumentation & SCADA, electrical, and HVAC. Project Location: Training Field Road, Chatham, MA -The treatment plant will remove iron, manganese and PFAS from two wells located at the treatment plant site on Training Field Road. The work includes, but is not limited to, excavation and backfill, site utilities, concrete and masonry building construction, process piping, chemical feed systems, HVAC, plumbing, fire protection, electrical systems, and instrumentation and controls. Construction is expected to begin in May 2024. Following prequalification, the Town of Chatham will invite the prequalified respondents to submit General Bids and Filed Sub-bids for the project. Disadvantage Business Enterprise (DBE) goals for the project are 4.2% D/MBE, and 4.5% D/WBE participation by certfieid DBE firms. The project shall be completed within 640 calendar days from the Notice to Proceed. Estimated Construction Cost: $16,600,000 Estimated Project Duration: 640 days from Notice to Proceed The scope of work includes construction of a 1.44-million gallons per day (MGD) of drinking water to provide treatment for the removal of iron, manganese and PFAS from the Town's existing groundwater wells 5 & 8. The project consists of constructing a new 134' x 52' masonry water treatment facility, a new gravel and asphalt driveway to access the treatment facility, and new pump motors in the existing buildings for wells 5 and 8, which are located off Training Field Road. The proposed project will include new pumps, new chemical systems, greensand and granular activated carbon filtration vessels, instrumentation & SCADA, electrical, and HVAC. Question Deadline 01/03/2024 Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: CSD, or sent via email to Mahoney.Carolyn@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids.

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.