Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

February 16, 2024

July 15, 2024

FL-2

Paving, Renovation, Site Work

No Information to Display

$330,000.00

Public - County

img_map_placeholder

FL-2, Defuniak Springs, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Board of County Commissioners, Walton County, Florida (the "County") is seeking competitive bids for the CR 2 Over Long Creek Bridge Repair Project. Installation of a Crutch Bent, at Intermediate Bent 3, for the existing bridge on County Road 2 over Long Creek in Walton County, Florida. Crutch Bent consists of 18" square concrete piles, concrete pile caps and 36" Florida I Beams. Temporary Traffic Control is required during construction. The last date to submit questions is January 10th, 2024, no later than 12:00 Noon. All questions are to be directed in writing to waljames@co.walton.fl.us. Directing questions to any other staff, project engineer and any other person is prohibited and will result in bid being disqualified. Questions received after such date and time will not be answered. Each Bid must be accompanied by Bid security in an amount of five percent (5%) of the Bidder's base bid price made payable to Walton County Board of County Commissioners, and in the form of a certified bank check or a Bid Bond on the form attached, issued by a surety authorized to conduct business in the State of Florida and having an A. M. Best rating of V-A or better and who is listed on the United States Treasury Department's T-list as acceptable to issue bonds for the applicable dollar amount. Contractor shall substantially complete the Project within ONE HUNDRED TWENTY (120) calendar days of issuance of the Notice to Proceed. Final completion of the project shall be accomplished within THIRTY (30) calendar days from the date a punch list of the remaining items to be completed is issued by the County.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects