Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 8, 2024

August 9, 2024

600 Campus Dr

Renovation

No Information to Display

$900,000.00

Public - City

img_map_placeholder

600 Campus Dr, Wentzville, MO

18

16

22

3

Subscribe to View Full Documents

For the FACS and Welding Shop Renovations at Holt High School Renovation area is approximately 9,000 sq. ft Each General Contractor shall file with his bid a cashiers check in the amount of five percent (5%) of the total bid. Final Completion August 9, 2024 The Board of Education reserves the right to waive to reject any or all bids. Information as to bidding instructions and requirements for procuring bidding documents may be obtained from the Architect. Not less than the prevailing hourly wage rates, as determined by the State of Missouri, Division of Labor Standards, shall be paid all workers employed on this project.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.