Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 23, 2024

February 22, 2024

November 30, 2024

Mill St

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Mill St, Indianapolis, IN

25

11

2

Subscribe to View Full Documents

Jasper Multi- Use Pathway- Phase 2 Mill Street to St. Charles Street All Sealed Bids shall be turned into the Office of the City Engineer, 610 Main Street, Jasper, IN 47547. From Mill Street to 30th Street, the scope-of-work for Jasper Multi-Use Pathway Project includes an 8 feet wide multi-use pathway and grading for drainage. From 30th Street to Newton Street, the scope-of-work for the Jasper Multi-Use Pathway Project includes the construction of new concrete curb and gutter on the southside of 30th street, grading, and the construction of a 6 feet wide sidewalk along the back of the new curb and gutter. Drive reconstructions are anticipated as a part of construction. From Newton Street to St. Chares Street, the scope-of-work for the Jasper Multi-Use Pathway Project includes the narrowing and profile milling of Northwood Avenue, construction of new concrete curb and gutter, new drainage, grading, and the construction of an 8 feet wide multi-use pathway. During construction, two-way traffic will be maintained from Lottes Drive to Newton Street (US 231) by utilizing the existing north shoulder along 30th Street. One-way westbound traffic will be maintained from Newton Street (US231) to St Charles Street with a detour utilizing St. Charles, 36th Street and Newton Street for eastbound traffic No Work shall be done at the Site prior to such date. In accordance with the Agreement, the date of Substantial Completion is October 15, 2024 and the date of readiness for final payment is November 30, 2024

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects