Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

March 1, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$5,700,000.00

Public - City

img_map_placeholder

Multiple Locations, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Various Job Order Contracts (23 Low Bid JOC Contracts) Public Works is requesting bids for furnishing all materials, labor, and equipment required to complete construction for Job Order Contracts (23 JOC Contracts). Bidders will offer four pricing Adjustment Factors to be applied to the Prepriced Tasks in the Unit Price Books. Two types of Contracts will be awarded. Contract 1-Factor A will be for Specialty Construction projects to be performed during Normal Working Hours, Factor B for Specialty Construction projects to be performed during Other Than Normal Working Hours (overtime/non-standard shifts). Factor C will be for General Construction projects to be performed during Normal Working Hours, Factor D for General Construction projects to be performed during Other Than Normal Working Hours (overtime/non-standard shifts) Adjustment Factors shall apply to every Task in the Unit Price Book. Contract 2-Factor A will be for OSHPD projects to be performed during Normal Working Hours, Factor B for OSHPD projects to be performed during Other Than Normal Working Hours (overtime/non-standard shifts). Factor C will be for General Construction projects to be performed during Normal Working Hours, Factor D for General Construction projects to be performed during Other Than Normal Working Hours (overtime/non-standard shifts) Adjustment Factors shall apply to every Task in the Unit Price Book. The County will be using three different Job Order Contracting Systems to award these 23 Low Bid Job Order Contracts). Estimate:$5,700,000 Bid Security is required of each Bidder and shall be made payable to Los Angeles County, in an amount of Five Hundred Twenty-Five Thousand Dollars ($570,000) in the form of cash, a certified check, a cashier's check, or a bid bond issued by a California-admitted Surety. A scanned copy of the Bid Security will be accepted. The Board of Supervisors reserves the right to reject any or all bids or to waive technical or inconsequential errors and discrepancies in bids submitted in the public's interest. The Bidder must have a valid license, issued by the Contractors' State License Board, for the type of work proposed to be performed by the Bidder and each listed subcontractor under the contract. The required license(s) is required at time of bid in order to be considered a responsive bid.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects