Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

February 19, 2024

April 19, 2024

Siesta Dr

Site Work

No Information to Display

$125,000.00

Public - City

img_map_placeholder

Siesta Dr, Sarasota, FL

Subscribe to View Full Documents

The City of Sarasota is soliciting bids for the construction of Siesta Drive (Lift Station #3) Force Main Replacement. Pricing shall include all labor, material, equipment, testing, tax, overhead and profit necessary to install, construct, and place into service the items described in this Bid to provide a complete and functional system ready for use by the City. Description: Enter Total Bid price from Bid Form titled Bid Form/Schedule of Values Siesta Dr.(LS#3) Force Main Replacement located under Documents. Q & A deadline: Jan 10, 2024 5:00:00 PM EST All improvements are located on Siesta Drive near Lift Station No. 3 within the City of Sarasota and Sarasota County's rights-of-way. Life Station 3 is located at the northeast corner of Siesta Dr. and Norsota Way or just north of Nora Patterson Bay Island Park - South entrance (946 Siesta Dr., Sarasota). A. In case of additional staging area, a separate Temporary Staging Area agreement shall be executed between the Contractor and property owner and a copy of the recorded document is to be provided to the City of Sarasota Utilities Department or the Project Engineer. B. The Contractor is to maintain all roadway access during the pipe installation and must coordinate a phase-approach installation and/or closure to be approved by the Project Engineer. C. Work in this Section includes all labor, material, equipment, testing, tax, overhead, and profit necessary to install, construct, and place into service the items described in this Section to provide a complete and functional system ready for use by the City. D. WASTEWATER - 8-INCH PVC FORCE MAIN 1. Furnish an install 8-inch PVC Force Main by open cut. 2. Dewater, excavate, and restore all piping connections and trenches. 3. Properly restore all asphalt (GR-01-1) and sod of disturbed areas. 4. Pig and flush the existing 8" HDPE DR-11 and install temporary pig port.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.