Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 12, 2024

March 18, 2024

August 23, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$250,000.00

Public - City

img_map_placeholder

Multiple Locations, Lockport, IL

88

7

15

5

Subscribe to View Full Documents

2024 Roadway Reconstruction & Water Main Replacement Project Site Directions: 12th Street (State Street to Garfield Ave) Washington Street (13th Street to 11th Street) Lincoln Street (Division Street to 9th Street) Replacement, Storm Sewer Installation, Drainage Structure Installation, Aggregate Base Course, Pcc Sidewalk Removal And Replacement for Ada Compliance, Sidewalk Infill, Curb and Gutter Removal and Replacement, Driveway Removal And Replacement, Hma Surface Removal, Class D Patching, Hma Binder Course, Hma Surface Course, Pavement Markings, Regulatory Signs, Parkway Restoration, and All Incidental and Collateral Work Necessary to Complete the Project All in Accordance With the Specifications and Contract Documents No. 23-205 for the 2024 Roadway Reconstruction & Water Main Replacement Project (12th St., Washington St. And Lincoln St.). Prospective Bidders Are Advised to Carefully Review the Plan, General Conditions, Special Conditions, Special Provisions, and Details of This Document. Prequalification: Prequalification by Idot Will Be Required of All Contractors and Subcontractors on This Project in the Respective Discipline(S) They Will Be Responsible for Constructing. Hma Contractor Must Be Prequalified With the "003 - Hot-mix Asphalt (Hma) Plant Mix" This project is located on 12th Street (State St. to Garfield St.), Washington Street (13th St. to 11th St.), and Lincoln Street (Division St. to 9th St.) in the City of Lockport, Will County, Illinois. A pre-construction meeting will be scheduled by the City following the execution of the Contract and prior to the start of construction. At the preconstruction meeting the Contractor will be requested to furnish the City fluorescent pink and/or white water-based marking spray paint, bundle of pointed hardwood oak lath, bundle of hardwood oak stakes (2" x 2") and ribbon. Additional spray paint, lath or other materials listed may be requested during the project. These are for marking the proposed improvements and related work. The cost shall be included in the cost of the contract.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.