Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

September 2, 2024

December 1, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$189,600.00

Public - City

img_map_placeholder

Multiple Locations, Arnolds Park, IA

10

9

4

5

Subscribe to View Full Documents

2024 PCC Street Repair Improvements. Est. Completion Date: May 24, 2024 170 SY of 7" PCC pavement, 1176 SY of 6" PCC sidewalk/pavement, 83 SY of 4" PCC sidewalk,1357 SY of PCC pavement removal, 54 CY of core-out excavation, 110 ton of modified subbase and 217 ton of class "c" gravel. Proposed work adjacent to Zephyr Drive & Allen Avenue can be started after September 2, 2024 and shall be completed by December 1, 2024. The proposed work at the intersection of E Broadway St and Iowa St shall be started after September 2, 2024 and be completed by December 1, 2024.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects