Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

March 4, 2024

June 14, 2024

8505 Lakeside Pkwy

Paving, Renovation, Site Work

No Information to Display

$500,000.00

Public - State/Provincial

img_map_placeholder

8505 Lakeside Pkwy, San Antonio, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Question Cuttoff Date & Time 1/10/2024 05:00:00 PM (ET) Harmony Public Schools (HPS), dba HSA San Antonio -South TX district open-enrollment charter schools, will be accepting competitive sealed proposals for the Building Foundation Settlement Repair located in San Antonio, Texas. The project scope of work includes creating a floor plan sketch, elevation survey, purchasing the equipment, demolition concrete, installing and remediation helical piers, polyurethane injection, root barrier, repair sidewalk movement, and drainage issues work as specified in the project documents. (#HPS2023_HSASan Antonio Foundation Repair). Estimated Budget: The estimated budget for this project is $ 500,000. Proposers may submit questions through the HPS ebid system. Question cutoff date and time is Wednesday, January 10, 2024, at 4:00 pm CST. Proposers are required to complete all sections provided in the ebid system. HPS intends to sign a contract for Building Foundation Repair by 3/04/2024. Time is of the essence for this project. All items listed in the construction documents shall be completed no later than June 14, 2024. Deadline will not be moved due to rainy days. Time is of the essence regarding the performance of all Work. If the Contractor fails to achieve Substantial Completion on or before June 14, 2024, Contractor shall pay to the Owner, as liquidated damages, $500 per day for each calendar day that Substantial Completion is delayed thereafter. HPS reserves the right to withdraw/cancel this solicitation at any time for any reason, remove any scope component for any reason and to issue such clarifications, modifications and/or amendments as deemed appropriate by HPS, in its sole discretion. HPS is an equal opportunity/educational institution, which does not discriminate on the basis of race, color, religion, national origin, gender, age or disability.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.