Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 24, 2024

June 3, 2024

September 6, 2024

1202 Lincolnway E

Renovation

No Information to Display

$1,200,000.00

Public - City

img_map_placeholder

1202 Lincolnway E, Mishawaka, IN

Subscribe to View Full Documents

A single Lump Sum bid will be considered for the Work. By submitting Bid on enclosed Bid Form, Bidder satisfies requirement for Indiana Form No. 96 (Revised 2013), as prescribed by State Board of Accounts of Indiana. This shall clearly show Bidder's financial resources, construction experience, organization, and equipment available for Work contemplated. A bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction," or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 10 percent of the total bid. Bid security shall be forfeited if bid is withdrawn after closing time on date for receiving bids. Successful bidders are required to furnish satisfactory separate Performance Bond and Payment Bond AIA Document A312, from an acceptable surety in an amount equal to 100 percent of the full contract sum. The Owner reserves the right to reject each and every bid, and to waive informalities, irregularities, and errors in the bidding to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. No bidder may withdraw their bid within 60 days after the actual date of the bid opening thereof. Removal and replacement of existing HVAC equipment, rooftop units, and ductwork, including all associated work and services applicable to equipment operation. This includes demolition of existing services and components and establishment of new services to new equipment for a complete and functioning system at completion.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.