Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 20, 2024

March 6, 2024

August 16, 2025

Boca Ciega Dr

Paving, Site Work

No Information to Display

$470,000.00

Public - City

img_map_placeholder

Boca Ciega Dr, St Pete Bch, FL

163

15

171

Subscribe to View Full Documents

The City of St. Pete Beach is soliciting bids from qualified Contractors for Boca Ciega Drive Improvements from 75th Ave. to 87th Ave. Question Deadline 01/10/2024 at 10:00 AM ET All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City. -Email - jtaylor@stpetebeach.org PROJECT DESCRIPTION: The project includes the construction of St. Pete Beach Boca Ciega Drive Roadway Improvement Project, including roadway and streetscape improvements from 75th Avenue to 87th Avenue. The limits of construction span from the eastern curb to the western right-of-way limits on Boca Ciega Drive. The scope of work includes replacing the curb along both sides of the road, the reduction of travel lane widths to 10 feet, the installation of a mid-block crossing for the Community Center near 76th Avenue, the replacement of the sidewalk on the west side of the road with an 8-foot sidewalk, the addition of shared-lane bicycle signs/marking, a 5-foot minimum landscaped buffer between the new sidewalk and the roadway, shade trees (where possible), speed tables for traffic calming at the intersections of 77th Avenue and 84th Avenue, and on-street parking. All work is to comply with the latest edition of the Pinellas County Standard Technical Specifications for Roadway and General Construction and the Pinellas County Standard Detail for Pavement Cuts, Excavation, and Restoration

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.