Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

June 20, 2024

December 21, 2025

401 Cochituate Rd

Addition, Demolition, Site Work

No Information to Display

$35,000,000.00

Public - State/Provincial

img_map_placeholder

401 Cochituate Rd, Framingham, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe to View Full Documents

CMR L1629 FRA LEX GARAGE EXPANSION The project builds upon the existing 4-level garage (grade plus 3 elevated levels). The foundation and structure were designed to accommodate this vertical expansion up to a 7-level garage. Thus, the proposed project includes the construction of three new precast concrete elevated levels of parking above the existing roof level; extension of the existing stair and elevator towers; two new passenger elevators and extension of two existing elevators; renovations to the interior of the passenger terminal building located on the ground level and extension of the existing building systems. The project will incorporate sustainable design elements to the maximum extent practical. Estimated Cost $35,000,000 All questions relative to your submission shall be directed to CPBidQuestions@massport.com. In th subject lines of your email, please reference the MPA Project Name and Number. It is strictly prohibitedfor any proponent to contact anyone else from Massport about this project from the time of this solicitation until award of the project to the successful proponent Deadline for submission of written questions Thursday, December 22, 2023 at 5:00PM Massport has established a TWO PHASE PROCESS for the selection of a Construction Manager at Risk firm, hereinafter referred to as the CMR with whom it may enter into a contract to provide construction management services for a particular project. At the Phase I Qualifications stage, the Prequalification Committee will conduct a qualifications based evaluation of interested CMR firms in order to create a shortlist of competent CMR firms. Phase II will invite the shortlisted CMR firms to respond to a written RFP which will require both a technical proposal and a pricing proposal including the proposed fee. A Selection Committee will review Proposals in order to rank the shortlisted firms and make the final selection. The scope of work further includes general site restoration, wetlands mitigation, construction phasing and sequencing, architecture, pedestrian circulation/wayfinding, means of egress, revenue control, signage/graphics, stairs, elevators, ADA and code compliance, HVAC, plumbing, fire protection, electrical, lighting, power, security, solar PV, and other systems and facilities required by existing codes and regulations and necessary to achieve a complete functional facility. Refer to the concept plans in the attached Exhibits for a graphical representation of the project's main components and general configuration. Begin Construction Summer 2024 Substantial Completion Winter 2025

47 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects