Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

January 24, 2024

July 26, 2024

7700 S Watson Rd

Renovation

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

7700 S Watson Rd, Arlington, TX

11

17

2

4

Subscribe to View Full Documents

Timberview High School Field House Repairs A. Work Included: 1. Contractor shall comply with the following requirements concerning scope and work restrictions. 2. If the Contractor believes that meeting the restrictions in this section would cause a delay to the intended schedule, they shall issue an RFI requesting specific modifications to that specific Work Restriction that would permit construction to continue without delay and indicating the reasons for the request. If construction proceeds without meeting any of the restriction requirements or obtaining approval for a modification of these requirements, the Contractor shall be responsible for all costs associated with removing and replacing all construction that occurred in violation of the Work Restrictions, if directed to by the Architect, without any increase in approved construction costs or schedule for the project. B. Related Work: 1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. 2. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. C. Specific Project Restrictions: 1. Contractor shall be advised that the school will be operating during the duration of this project. 2. Contractor shall coordinate with the Owner any activities which will disrupt normal school operations. 3. Before project completion and a certificate of occupancy is issued, Contractor shall provide fully established grass at locations including but not limited to all disturbed areas, under items that have been stored on site, construction trailers and storage units. 4. Contractor may begin construction on or about January 24, 2024 and shall be substantially complete on July 26, 2024

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.