Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 5, 2024

April 5, 2024

April 4, 2025

To Be Determined

Demolition, Renovation, Site Work

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Bangor, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe to View Full Documents

Firm-Fixed-Price (FFP) for all labor, materials, equipment, and associated costs for a Design-Build to include demolishing and replacing the MK10 Bridge Crane System, and upgrading or replacing the branch circuit providing power to the crane system, in Building 7000, Bangor Base, WA. The estimated budget is between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects