Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 26, 2024

November 30, 2024

Waite St

Renovation

No Information to Display

$2,500,000.00

Public - County

img_map_placeholder

Waite St, Wildomar, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Elsinore Valley Municipal Water District (EVMWD) is a publicly owned water and sewer service agency with approximately 46,000 water services and 36,600 sewer service connections, serving a population of approximately 157,000. EVMWD is located in the southwestern Riverside County and encompasses portions of Lake Elsinore, Canyon Lake, Wildomar, some parts of Murrieta and unincorporated parts of the Riverside County. The existing water system consists of 46 pressure zones. Within these zones, there are 69 active potable storage reservoirs and 54 booster pump stations. Question Deadline 01/04/2024 at 10:00 AM PT Project Start February 26, 2024 Provide engineering design services including but not limited to contract documents including plans and specifications, comprehensive utility search, permit acquisition for design and construction, easement and/or right-of-way documentation (if needed), detailed construction cost estimate, and other engineering services, as described herein. A detailed Scope of Services is attached hereto as Attachment "1". While the full scope of work shall be negotiated in a Professional Services Agreement, the Respondent will be expected to fulfill, at a minimum, the services and technical requirements described in the attached Scope of Services EVMWD intends to initiate the design for this project on February 2024, anticipating design completion on November 2024. Consultant shall remain on contract for the duration of construction. EVMWD reserves the right to reject any or all Proposals or to select the Proposal most advantageous to EVMWD. EVMWD reserves the right to verify all information submitted in the Proposal.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects