Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2024

October 1, 2024

September 30, 2029

7850 Melrose Ave

Renovation

No Information to Display

$91,000,000.00

Public - City

img_map_placeholder

7850 Melrose Ave, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Anticipated Issuance of Notice to Proceed October 2024 The project is anticipated to be completed no later than the third (3rd) quarter of 2029. Requests for Clarification/Information (RFC/RFI) Due 3:00 p.m., January 8, 2024 The proposed Project consists of the construction of new school buildings, and the demolition of aging and deteriorating buildings. The Project scope also includes interim facilities, as necessary, to accommodate the temporary displacement of any facility and its associated function during construction. 2.1 Detailed Scope of Work The scope of the proposed Project includes, but is not limited to: A. Construction of a new Gymnasium Complex, 5 Specialty classrooms including Ceramics, Music, Drama, Dance and Sports Medicine, and a new Maintenance and Operations yard and building. B. Demolition of Shop Building and Gymnasium Building C. Demolition of relocatable restroom building and ticket booth D. Exterior painting of remaining buildings, (except Greenway Arts Building) to provide a uniform appearance. E. Interim facilities in existing campus spaces as required. F. Upgrade/restoration of any campus areas as impacted by interim facilities. G. Utility Upgrades necessary to complete project scope: 1. New or upgraded Sanitary Sewer Lines 2. New or upgraded Storm Water Lines 3. New Water Lines 4. New Fire Water Lines and New on-site Fire Hydrants as required 5. Electrical and Low Voltage & Fire Alarm 6. Replacement of main electrical switch gear at Main DWP Transformer. H. Improvements to landscape, hardscape, parking, and site lighting within Development zone. I. Upgrades as needed to fencing, fixtures and equipment, gates, and other upgrades as required to support the new facilities. J. Improvements as required by the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), California Environmental Quality Act (CEQA), Department of Toxic Substances Control (DTSC), and any other required improvements or mitigations to ensure compliance with local, state and/or federal facilities requirements. K. Utility agency approvals and connections. L. Approvals from other Regulatory Agencies as required. M. Coordination of District furnished furniture and equipment (FF&E). N. The District has prepared an initial HREH report for this school site and a CEQA interpretive program will not be required. District has established participation goalsto attain twenty-five percent (25%) of the contract dollars going to certified SBE/MicroSBE and five percent (5%) going to VBE/DVBE. All Proposers shall implement policies, procedures and methods to meet these goals, which may include but not be limited to the procurement of supplies, equipment, technical services, and/or other services under this contract.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects