Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 8, 2024

No Information to Display

1921 E Lake Rd

New Construction, Site Work

No Information to Display

$39,300,000.00

Public - City

img_map_placeholder

1921 E Lake Rd, Erie, PA

219

59

38

Subscribe to View Full Documents

Scope of Work This Plan Describes Work Required to Comply With the International Code Council 500- 2014, Section 107.3. This Structural Quality Assurance Plan Shall Be Used in Conjunction With the Statement of Special Inspections for the Project. The Contractor Shall Retain a Qualified Special Inspector to Perform the Work Described Herein. Proposals for Special Inspection Services Shall Be Separate and Independent From All Other Proposals for Materials Testing and Other Quality Assurance Services. The Special Inspector Shall Verify That the Primary Structural Frame (All Those Members Which Transmit Loads to The Ground) is Constructed in Substantial Accordance With the Permitted Official Contract Documents. This Plan May Be Supplemented by Additional Requirements of the Municipality, or by the Owner, as Deemed Necessary During the Course of the Work. This Does Not Include Inspection of Any Safety Provisions as Required by Osha, or Other Safety Standards Which Apply During the Construction Period, to Elements Such as Railings, Panels, Fire Protection, Roofing, Glazed Window Systems, Mechanical/electrical Systems, Architectural Components, Site Work, and Other Elements Not Contributing to the Capacity of the Primary Structural Building Frame. The Official Contract Documents Are Defined as the Permitted Plans, Recorded Addenda, Project Specifications, Amendments, Statement of Special Inspections, and the Structural Quality Assurance Plan. The New Edison Elementary School, 1921 E. Lake Rd., Erie, PA 16511 All Bids shall include a Bid Security Bond or Certified Check, payable to The School District of the City of Erie, in an amount of five percent (5%) of the bid, in accordance with the Instructions to Bidders, as included in the Contract Documents. Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidders Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period,

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.