Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

January 10, 2024

May 1, 2024

To Be Determined

Paving, Site Work

No Information to Display

$70,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Frankfort, KY

5

6

7

11

Subscribe to View Full Documents

**Per Addendum 2 the bid date has been extended from 12/28/23 to 01/04/24** The proposed project consists of fixing a sinkhole that has developed again in the high school parking lot. KY AML has completed previous attempts at this location in 2002 and 2018. The school is located over old mine works in the Princess No. 7 seam and the Princess No. 6 seam. There are no mine maps available in this area. A mine blowout in 2002 occurred at this location. KY AML has previously installed drainage to control this mine water flow and this project will add to that existing system and address failures within the parking area. A subsidence hole open again in 2018. The subsidence hole was excavated and was backfill with rock. Sub-drains to control the water from the Princess No. 7 seam crop were installed. The subsidence hole has opened again. This subsidence hole has continued to enlarge in size. It estimated that the Princess No. 6 seam is located approximately 60 feet below the Princess No. 7 seam. Reclamation work consists of excavating to an approximate depth of 12 feet. The work will consist of the following items. Excavating and locating the existing storm drains and reconstructing a headwall collection system at the entrance to the existing 32”x56” CMP Arch located at the eastern side of the parking lot. The hole then will then be backfilled with a layers of Class 2 rock, Number 2 and Number 4 rock, with confining geogrid to reduce the chance of piping to within 1 foot of the surface. Then roadway stone and bituminous repair of the parking area. The waste material will be hauled to the Northeastern Fishing and Hunting Club. Location is Lat N 38 deg. 21’ 34", Long W 82 deg. 44’ 59"

50 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.