Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 4, 2024

February 5, 2024

August 1, 2024

1470 E Golden Valley Rd

Paving, Site Work

No Information to Display

$161,800.00

Public - County

img_map_placeholder

1470 E Golden Valley Rd, Reno, NV

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Scope of Work: Approximately 162 Square Feet of running track repairs for a 400M, 8 lane track, 150 foot long jump runway. 2 d-zones with pole vault runway, including all surface preparation, various crack repairs and leveling. A 3mm re-top of the existing rubber surface with specified striping. In addition, crack sealing of all adjacent curbs and valley gutters is to be included. An additional 100 Square Feet at various locations shall be considered as contingency within base of work. Each individual bid shall be accompanied by a surety company issued Bid Bond or by a Certified or Cashier's Check made payable to the Washoe County School District, in the amount of not less than five percent (5%) of the bid, said amount to be forfeited to WCSD, should the Contractor to whom the Contract is awarded fail to enter into the Contract in accordance with the Contractor's bid and any other contract documents and furnish the required bonds within ten (10) days after the delivery of notice of such award. Estimate: 167,000.00 Question Deadline 12/20/2023 at 4:30 PM PT All questions shall be submitted in writing directly to WCSD's Solicitations website at via e-mail to solicitations@washoeschools.net The physical work is to be commenced upon issuance of a "Notice to Proceed". Work shall be completed on or before August 1, 2024 The right is reserved by WCSD to reject any and all bids or accept the bid, which is deemed by WCSD to be in the best interest of the school district. WCSD also reserves the right to waive any irregularities and/or informalities in the submitted bids. The work shall include the furnishing of all labor, tools, equipment, material, transportation and the performance of all operations required for the Repairs and Track Rubber Overlay at North Valleys High School at the site(s) and associated work as specified herein and shall include the cleanup and removal from the site(s) of all debris resulting from the operations performed. It shall also be the Contractor's responsibility to take all necessary safety precautions and to furnish barricades and/or other safety measures as required. All work shall be performed in strict accordance with the requirements of these specifications and any and all appropriate state, county and local ordinances.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.