Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 11, 2024

May 31, 2024

US-22

Paving, Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

US-22, Colliers, WV

55

9

8

4

Subscribe to View Full Documents

Contract : 2023050003 State Project : S305-22-0.12 00 23 Federal Project: STBG-0022(084)D County: Brooke DBE Goal: 12 % of Contract Bid Amount. Bidder Must Provide Written Assurance of Meeting Goal on Form in Proposal. Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virginia Code. All contractors submitting bids on project(s) must submit electronically with their bid a Proposal Guaranty Bond for $500.00 or 5% of the total bid, whichever is greater. The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WV DOT - 017 - US 22 Ramp A Project Description: Repairing the substructure elements, replacing the expansion joints, cleaning the bridge deck and drainage system, cleaning and painting the abutment bearings, and milling and paving the approach roadways. The concrete abutments and wingwalls will be patched, crack sealed, and painted with epoxy resin and concrete protective coating. The expansion joints at the abutments will be removed and rebuilt using a strip seal joint system. All work will be within the existing right of way. There will be no tree removal or work below OHW.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects