Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

February 26, 2024

November 7, 2025

PA-6

Paving, Site Work

No Information to Display

$7,276,276.00

Public - State/Provincial

img_map_placeholder

PA-6, Wellsboro, PA

220

11

220

7

Subscribe to View Full Documents

The Description and Location of the Project is as Follows: Milling, Resurfacing, Bridge Rehabilitation. Drainage, Guide Rail and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 6, Section 179, Section 135, and Section 202 in Tioga County, Mansfield Borough From Approximately 0.4 Miles East of the Sr 15 Interchange at Segment 0780 Offset 1053 to Approximately 1.4 Miles West of the Intersection With Sr 549 at Segment 0820 Offset 0376 and State Route 2005, Section 026, in Tioga County, Richmond Township From Approximately 0.7 Miles North of the Intersection of Sr 2027 at Segment 0460 Offset 0758 to the Connection With Sr 8003(Ramp B) Sr 549 at Segment 0530 Offset 2375. Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 6.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Tioga River to Swan Street *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects