Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2024

January 29, 2024

March 15, 2024

Multiple Locations

Site Work

No Information to Display

$25,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Halsey, NE

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe to View Full Documents

01/09/2024 - Additional information - I have received an answer for requests for pump house drawings and a geo-technical report. I have attached what the COR has provided me. From the COR: "We did not have any geo-technical survey or report conducted of the site. The work site is located in the sandhills, so sand is the predominate soil type. I have attached a single report from Web Soil Survey, but there are numerous reports that can be generated on the site. Also, the lat/long for the pumphouse is 41.901722, -100.306267 so that potential bidders are can generate reports at their discretion. We also do not have as-built drawings for the existing pumphouse, we were not given any by the contractor that initially installed the building. It is a precast concrete structure that is approximately 11' wide by 12' long and 10' tall with 4" thick walls and a 5" thick floor. " Project Name: Pump House Stabilization Description of Work: Work for This Project Consists of Stabilize the Bessey Nursery Pump House Using Push Piers or Equivalent, to Prevent the Building From Moving. There Are 3 Existing Waterlines That Run Out the South and East Side of the Building Along With Electrical Lines. Location: This Project is Located on the Bessey Nursery Complex on the Nebraska National Forests and Grasslands Located Two (2) Miles West of Halsey, Nebraska. (Thomas County, Ne) Period of Performance: 01/29/2024 to 03/15/2024

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.