Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

March 18, 2024

July 16, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,047,707.00

Public - County

img_map_placeholder

Multiple Locations, Sanford, FL

3

15

2

5

Subscribe to View Full Documents

Seminole County's Public Works Department is seeking a qualified contractor to supply all labor, materials, equipment, transportation, coordination and incidentals necessary for the construction of 0.217 miles of recreational path that will allow connectivity and provide access from the US 17/92 adjacent sidewalks to the Cross Seminole Trail. The Scope of Work is to include, but not limited to, a retaining wall system, drainage improvements, concrete sidewalk, signage and pavement marking, clearing and grubbing, excavation, embankment, and the maintenance of traffic. Prime Contractor shall be FDOT Prequalified in the following work classes: 7. Drainage, 11. Grading. Prime Contractor or Utilized Subcontractor shall be FDOT Prequalified in the following work classes: 40. Sidewalk, 40. Handrail, 40. Retaining Wall. Contractor must be in business for at least (3) years and have completed at least (3) similar projects based on the Scope of Services within the last (5) years and met or exceed all other requirements listed within this Solicitation and Scope of Services. Completion Time: Work must be substantially complete within (90) calendar days from the issued Notice to Proceed (NTP) and must reach final completion (30) calendar days after substantial completion. Question Submission Deadline: December 24, 2023, 2:00pm Question Response Deadline: January 3, 2024, 2:00pm Engineer's Estimate: $1,047,707.20 Seminole County's Public Works Department is seeking a qualified contractor to supply all labor, materials, equipment, transportation, coordination and incidentals necessary for the construction of 0.217 miles of recreational path that will allow connectivity and provide access from the US 17/92 adjacent sidewalks to the Cross Seminole Trail. The Scope of Work is to include, but not limited to, a retaining wall system, drainage improvements, concrete sidewalk, signage and pavement marking, clearing and grubbing, excavation, embankment, and the maintenance of traffic. All questions about the meaning or intent of the Bid Documents shall be submitted to the attention of the Contracts Analyst identified in the Invitation for Bid advertisement as the contact person for this project.

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.